• 4 MONTHS

    27MW: The fastest delivery at a speed of 27MW within 4 months

  • 1000 EFLOPs(FP16)

    Maximum Supportable Computing Power

  • 1356 MW

    Total Capacity

  • 5 +GW

    Renewable Energy Reserves

HOYINN

TO BE THE LEADING ECOSYSTEM OF CROSSING 

GREEN ENERGY AND DATA INDUSTRIES

DC & RENEWABLES SYNERGY CASE

THE INTEGRATION OF “SOURCE-GRID-LOAD-STORAGE” PRACTICE

LARGEST “SOURCE-GRID-LOAD-STORAGE” INTEGRATED DEMONSTRATION PROJECT IN THE CORE AREAS SURROUNDING BEIJING


  • SOURCE

    In the Zhangjiakou area(i.e,zhangbei,guyuan,yu county), wind and solar power projects are being implemented

  • GRID

    Plan in batches and adopt the project access scheme. Ensure the consumption of green electricity and realize the transmission to the southern area of Zhangjiakou. The outbound line is 515 kilometers long and there are 15 booster stations. 

  • LOAD

    HOYNN (Huailai) Technology Industrial Campus

  • STORAGE

    Deploy energy storage on the power supply side and develop shared and independent energy storage .

  • SOURCE
  • GRID
  • LOAD
  • STORAGE
Back
OUR PARTNERS
Leading companies choose HOYINN